2014.05 Prepared and started the second-stage project.
2013.12 Qufeng trial production succeeded, and run into normal production. The capacity of Wheat Gluten is 45,000.00mt a year.
2013.10 Qufeng construction finished and run into trial production.
2012.03 Qufeng projection approved and started to be constructed .